| Real Value of Assets |
1 |
2011-03-02 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-306) Perhaps, Figure1-1 should be updated with inclusion of a cloud representing T&D Utility,as retail consumers are typically severed by a distribution utility. |
2 |
2011-03-02 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-195) Lines 598, 604where is the interaction for DR Standing Bid defined? |
2 |
2011-03-02 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-201) Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. |
1 |
2011-03-02 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-201) Line 706: OptOutequivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. |
1 |
2011-03-02 |
| [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-251)EiEvent uses EiClass "Location" but should use CIM InterfacePricingPoint |
1 |
2011-03-02 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-252) EMIX supportfor a "contract" flag should be verified if needed. |
1 |
2011-03-02 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-263) Additionaltypes needed in EventInfoType plus name and association changes |
1 |
2011-03-02 |
| Groups - energyinterop-1-0-spec-wd20-with-changes.doc uploaded |
1 |
2011-03-03 |
| Groups - energyinterop-1-0-spec-wd20.doc uploaded |
1 |
2011-03-03 |
| Groups - energyinterop-1-0-spec-wd20.pdf uploaded |
1 |
2011-03-03 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-215) Remove 0-* asoptional requirements/services/elements as it creates interoperabilitychallenges (WD15, ln 643-649) |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-241) Clarify intentand semantics of SendQuote operation (WD15, ln. 624) |
2 |
2011-03-05 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-214) Add amechanism for VEN to send status information to VTNs - a with request fromVTN (WD15, section 5): |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-99) 874 - Ifthere's a testing and conformance process, could be referenced. |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-210) Critical: UMLClass Diagrams for EiEvent and Associated Classes, Operation Payloads(WD15, ln. 643-649) |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-327) Add mechanismfor VEN to query the VTN to find what signals to expect for a specificprogram |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-328) Clarifyrelationship between figures 9 and 10 |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-329) Describe thedifference between EISendEventPayload and EISentEventPayl |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-329) Describe thedifference between EISendEventPayload and EISentEventPayoad |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-330) Allow mechanismfor interactions between VEN andVTN for transactions. |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-331) Add attributefor schema versions (schemaVersion in OpenADR 1.0) |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-332) Add mechanism toidentify test events |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-210) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-331) Add attributefor schema versions (schemaVersion in OpenADR 1.0) |
1 |
2011-03-05 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-205) Line 721:testEvent should be expanded from Boolean to allow for indication of othertypes of Events: Advanced (Normal), Immediate, Audit/Test. |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-212) UML ClassDiagrams for EiEvent and Associated Classes, Operation Payloads (WD15, ln.643-649) |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-250) schemaVersionshould be added to all schemas |
2 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-327) Add mechanismfor VEN to query the VTN to find what signals to expect for a specificprogram |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-250)schemaVersion should be added to all schemas |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-316) CLONE -Line 706:OptOut equivalent in IRC model includes: economic, emergency, must run, notparticipating, outage run status, override status, participating. |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-333) Patterns forstrings and extension needs to be applied to EI |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-297)Need better grid coordinate specifications in EiEvetn class (line 892) |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-229) Locationattributes within EiEvent are weak. (WD16 - 642) |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-302) MultipleElements Defined in Service Inventory & Data Model submitted by OSG are notdefined in CD01 |
2 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-300) May need todefine the enumerated values for the EiEvent Status (line 892) |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-300) May need todefine the enumerated values for the EiEvent Status (line 892) |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-301) Section 7:Register Services should include register Resource and Asset |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-295) 247: MissingInteractions and Data Elements |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-295) 247: MissingInteractions and Data Elements |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-301) Section 7:Register Services should include register Resource and Asset |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-216) Critical:Provide a mechanism for load bidding information in EiEvent (WD15, 643-649) |
1 |
2011-03-06 |
| Groups - energyinterop-1-0-spec-wd21.doc uploaded |
1 |
2011-03-06 |
| Groups - energyinterop-1-0-spec-wd21.pdf uploaded |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-335) Sections 6 and 7of WD21 have essentially the same Section Title - suggest title changes, |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-334) KML or GML? GMLStandard Profile would be consistent with CIM grid locations and EmergencyManagement |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Issue Comment Edited: (ENERGYINTEROP-295)247: Missing Interactions and Data Elements |
1 |
2011-03-06 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-336) EiProgramCallservice name is confusing especially with EiProgram class, ProgramName andProgramID not direclty related |
1 |
2011-03-07 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-336) EiProgramCallservice name is confusing especially with EiProgram class, ProgramName andProgramID not direclty related |
1 |
2011-03-07 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-338) WS-Calendar andEMIX terminology and models have changed since PR01. |
1 |
2011-03-07 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-339) agreementName isout of date |
1 |
2011-03-07 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-338) WS-Calendar andEMIX terminology and models have changed since PR01. |
1 |
2011-03-07 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-340) Need consistentuse of UID, name, program etc ID, and mrid |
1 |
2011-03-07 |
| Groups - energyinterop-1-0-spec-wd22.doc uploaded |
1 |
2011-03-07 |
| Groups - energyinterop-1-0-spec-wd22.pdf uploaded |
1 |
2011-03-07 |
| RE: [energyinterop] Groups - energyinterop-1-0-spec-wd22.docuploaded |
1 |
2011-03-07 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-334) KML or GML?GML Standard Profile would be consistent with CIM grid locations andEmergency Management |
1 |
2011-03-07 |
| FW: Webinar Agenda for Website |
1 |
2011-03-07 |
| Groups - Energy_Interoperation_WD22a_20110309.eap.zip uploaded |
1 |
2011-03-10 |
| Groups - EnergyInterop Minutes 20110302 (EnergyInterop Minutes 20110302.doc) uploaded |
1 |
2011-03-15 |
| Groups - Energy Interoperation TC Weekly Teleconference modified |
3 |
2011-03-16 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-341) Remove ProgramService from 1.0 Release |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-333) Patterns forstrings and extension needs to be applied to EI |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-343) Payloads forEiEvent Service need additional information |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-343) Payloads forEiEvent Service need additional information |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-330) Allowmechanism for interactions between VEN andVTN for transactions. |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-330) Allow mechanismfor interactions between VEN andVTN for transactions. |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-335) Sections 6 and 7of WD21 have essentially the same Section Title - suggest title changes, |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-341) Remove ProgramService from 1.0 Release |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-343) Payloads forEiEvent Service need additional information |
2 |
2011-03-16 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-329) Describe thedifference between EISendEventPayload and EISentEventPayoad |
1 |
2011-03-16 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-344) Verbiage change |
1 |
2011-03-17 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-346) Verbiage -plurality doesn't match |
1 |
2011-03-17 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-347) Consolidatedlist of verbiage adjustments |
1 |
2011-03-18 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-348) Use of "Ack" asa string |
1 |
2011-03-18 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-349) EiEvent isoverly complex; simplify per current EMIX and WS-Calendar |
1 |
2011-03-20 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-350) enumerationattribute names are not consistent; should all be UpperCamelCase |
1 |
2011-03-20 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-351) In EiConstraintthe assocation for notificationInterval and maxEventDuration should beduration, not Sequence; the schedulel should be emix::BusinessSchedule |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-350) enumerationattribute names are not consistent; should all be UpperCamelCase |
2 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-353) Consider use ofEiConstraintBehavior for EiOpt; add text to spec to indicate Constraintbehavior |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-355) Payloads in themodel need care as to expected results |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-356) agreementName ortransactionName or programName, agreementID or transactionID or programID -should be consistent |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-357) UID in EiProgramis an unsignedInt, not a string |
1 |
2011-03-21 |
| Groups - Figures_WIP_Toward_WD23 (Images WD23 D12.zip) uploaded |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-358)deploymentLevelType needs to be corrected in EiEventInfo |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-359) In EiEventInfothe ID should be of type string, not eiEventInfoType. |
1 |
2011-03-21 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-360) InEiRegisterParty the attributes for payloads should not be EiParty (ingeneral) but a partyID which is a string |
1 |
2011-03-21 |
| Wed Energy Interop is regular meeting |
1 |
2011-03-21 |
| Groups - EnergyInterop Minutes 20110316 (EnergyInterop Minutes 20110316.docx) uploaded |
1 |
2011-03-21 |
| Groups - EnergyInterop Minutes 20110216 (EnergyInterop Minutes 20110216.docx) uploaded |
1 |
2011-03-22 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-361) In EiEventInfothe value for deploymentLevel should be string not DeploymentLevelType(which doesn't exist). |
1 |
2011-03-22 |
| Groups - EITC_20110321-2044a_Schemas.zip uploaded |
1 |
2011-03-22 |
| Groups - EI_WIP_20110321.EAP.zip uploaded |
1 |
2011-03-22 |
| Groups - Figures_WIP_Toward_WD23 (Figures_EITC_20110321-2044a.zip) uploaded |
1 |
2011-03-22 |
| Re: [energyinterop] Groups - Energy Interoperation TC Weekly Teleconferencemodified - March 30 |
1 |
2011-03-22 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-344) Verbiagechange |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-349) EiEvent isoverly complex; simplify per current EMIX and WS-Calendar |
1 |
2011-03-23 |
| Groups - energyinterop-schemas-wd23-wip2.zip uploaded |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-362) Schemas appearto use an eMIX power structure not based on IEC 61970 |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-365) EiResource useof power:meterID |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-366) No need foracceptTender and related payloads. |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-367) Consistency andcompleteness suggestions for Transactive Payloads for Tender andTransactions. |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-299) Need betterconsistency in the notion of an ID versus a name (line 892) |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-368) UseEMIX:BusinessScheduleType in OptOut & OptIn Schedule creates some amiguity |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-369) Opt containsadditional elements that are not in the submitted models - need explanationon why they are there |
1 |
2011-03-23 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-370) Use EMIXsemantic elements in EiConstraint and EiCOnstraintSchedule |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-370) Use EMIXsemantic elements in EiConstraint and EiCOnstraintSchedule |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-370) Use EMIXsemantic elements in EiConstraint and EiCOnstraintSchedule |
2 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-371) What is purposeof new EILocation element |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-372) Do we have anenum for the Event ModificationReason |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Updated: (ENERGYINTEROP-371) What is purposeof new EILocation element |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-373) How isevent::schedule different from event::OperatingDay |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-374)Event::vtnComment looks like an invitation to non-interoperability |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-375) Replaceevent::DeploymentMW with something else |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-376) EventID needssome clarification |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-348) Use of "Ack"as a string |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-377) Now that we havethe Energy / Power matrix |
1 |
2011-03-24 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-377) Now that wehave the Energy / Power matrix |
1 |
2011-03-25 |
| Electronic Ballots, etc |
1 |
2011-03-25 |
| RE: [energyinterop] [OASIS Issue Tracker] Commented:(ENERGYINTEROP-377) Now that we have the Energy / Power matrix |
1 |
2011-03-25 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-368) UseEMIX:BusinessScheduleType in OptOut & OptIn Schedule creates some amiguity |
1 |
2011-03-25 |
| FW: Ack Ack |
9 |
2011-03-26 |
| FW: VEN Response requirments (ACK) |
1 |
2011-03-28 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-380) Eliminate EventWindow and use EMIX Constraints |
1 |
2011-03-28 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-381) ReplaceeventWindow with BusinessSchedule from EMIX |
1 |
2011-03-28 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-382) Reviewdefintions of EventStatusEnumeratedType |
1 |
2011-03-28 |
| Groups - energyinterop-schemas-wd23-wip3.zip uploaded |
1 |
2011-03-28 |
| Groups - energyinterop-schemas-wd23-wip4.zip uploaded |
1 |
2011-03-29 |
| Groups - Energy Interoperation TC Weekly Teleconference cancelled |
1 |
2011-03-30 |
| EMIX and EITC meetings cancelled this weel; SGIP Priority ActionPlan 3, 4, and 9 webinars Wednesday March 30 |
1 |
2011-03-30 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-383) Constraints andConstraints Behavior re-factoring |
1 |
2011-03-30 |
| Groups - energyinterop-schemas-wd23-wip5.zip uploaded |
1 |
2011-03-30 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-384)RegistrationInfoType needs definition |
1 |
2011-03-30 |
| [OASIS Issue Tracker] Created: (ENERGYINTEROP-385)MaxConsecutiveDaysFilterType purpose and application un-clear |
1 |
2011-03-30 |
| [OASIS Issue Tracker] Commented: (ENERGYINTEROP-385)MaxConsecutiveDaysFilterType purpose and application un-clear |
2 |
2011-03-30 |