[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]
Subject: Minutes of Pacific UBL TC call 4 October 2011
MINUTES OF PACIFIC UBL TC MEETING 00:00 UTC TUESDAY 4 OCTOBER 2011
ATTENDANCE
Jon Bosak (chair)
Tim McGrath (vice chair)
G. Ken Holman
Andy Schoka
STANDING ITEMS
Additions to the calendar:
http://ubl.xml.org/events
TM: Will send in email.
UBL 2.1 PRD3
PSC (TM): A PSC meeting has been set for Wednesday.
TSC (AS): A TSC issues list has been prepared that compiles issues
from Audun, Roberto, and AS; a TSC meeting has been set for Thursday.
We are considering the idea of a single status query.
Documentation (JB):
All of the figures have been reworked in an attempt to create a
consistent style and eliminate a compute-intensive workaround in
generating the PDF.
The Intermodal Freight Management section has been moved to follow
Certification of Origin of Goods.
Section B.3.4 (Changes from PRD1 to PRD2) has been removed.
Biggest change: The table of document schemas has been replaced by
a new section 3.1, which provides links to everything in the
package associated with a given schema: xsd, xsdrt, rnc, mod (.ods
and .xls), summary, and example instance (where one exists). This
has allowed the removal of: the original table of document
schemas; the list of RNC schemas in G.2; and the list of
spreadsheets and summary reports in C.2 (note that summaries are
now described in a new section C.3).
A number of issues were discovered in restructuring the hub
document that will require some action (often just answering a
question) from PSC or TSC.
ACTION: JB to provide PSC and TSC with a list of issues
discovered while restructuring the hub document.
There are also a couple of deliverables dependent on freezing the
schemas that are listed here as AIs for tracking purposes:
ACTION: GKH to prepare a revised table of changes from 2.0 to
2.1 for B.3.3 once the schemas are finalized.
ACTION: TM to prepare a set of UML models once the schemas are
finalized.
TC CONCALL SCHEDULE
Week of 2011.10.03 Regular schedule
Week of 2011.10.10 *** CANCELED ***
Week of 2011.10.17 Regular schedule
Week of 2011.10.24 * possibly canceled *
Week of 2011.10.31 Regular schedule
OTHER BUSINESS
TM: Back home in Fremantle for the next 6 weeks.
Jon Bosak
Chair, OASIS UBL TC
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [List Home]