← Prev in month ← Prev in thread
Next in thread → Next in month →

[Fwd: Re: [wsrm] NEC Position on WS-RM flow/congestion control due tonetwork overload]

From
Doug Bunting <>
Date
2003-04-30T23:11:51+00:00
ID
Thread
[Fwd: Re: [wsrm] NEC Position on WS-RM flow/congestion control due tonetwork overload]
Forwarding Alan's reply on his behalf.  (We'll see if the OASIS mail 
systems honour my Reply-to setting.)  The email reached the destination 
reliably (and is hereby acknowledged) but was lost by the sender :)

A question to Alan: What does "TPDU failures" mean?  Transport delivery 
uncertain?

thanx,
	doug
← Prev in month ← Prev in thread
Next in thread → Next in month →