← Prev in month
← Prev in thread
Issue 193: Clarify why the spec mandates that JoinConditions must always be evaluated only after all source activities complete
Title: Message
This issue has been added to the
wsbpel issue list with a status of "received". The status will be changed to
"open" if the TC accepts it as identifying a bug in the spec or decides it
should be accepted specially. Otherwise it will be closed without further
consideration (but will be marked as "Revisitable")
The issues list is posted as a Technical Committee
document to the OASIS WSBPEL TC pages on a regular
basis. The current edition, as a TC document, is the most recent version of the
document entitled in the "Issues" folder of the WSBPEL TC document list -
the next posting as a TC document will include this issue. The list editor's
working copy, which will normally include an issue when it is announced, is
available at this constant URL.
Issue 193: Clarify why the spec mandates
that JoinConditions must always be evaluated only after all source activities
complete
Status: received
Date added: 27 Feb
2005
Categories: State
management
Date submitted: 26 February 2005
Submitter:
Prasad
Yendluri
Document: WS-BPEL Working Draft, December,
2004
Description: This is a follow on to issue 189 which we classified
as a new feature request.
The BPEL specification currently requires that a joinCondition on a target
activity be evaluated only after all sources activities for the links coming
into it are complete, even for an implicit OR <joinCondition> where the
status of only one of the incoming links needs to be positive.
This is a major constraint that disables straight-forward modeling of a large
class of processes where the target activity needs only one of its source
activities to complete successfully. An example scenario is a private auction,
where the auction tracking activity needs a bid to be placed by only one of the
N bidders possible, to start.
The only text in the specification that speaks to this major constraint is
hidden in one sentence in the text in section 12.5.1: "If an activity that is
ready to start ..., then it does not start until the status *of all its incoming
links has been determined* and the (implicit or explicit) join condition
associated with the activity has been evaluated."
Issue 189 called for lifting this constraint but the TC decided to not to
address this in this version of the specification. Different justifications for
not incorporating the change were alluded to by the TC members during the
discussion of issue 189, including increased implementation complexity and the
amount of changes needed to the specification.
However since this is a major constraint, the specification must minimally
clarify why this constraint is imposed by the specification.
Submitter's
proposal: I request that text be added to section 12.5.1 around the area
where this constraint is specified.
Changes: 27 Feb 2005 - new
issue
Best
Regards,
Tony
Tony
Fletcher
Technical
Advisor
Choreology
Ltd.
68, Lombard Street, London EC3V 9L J
UK
Phone:
+44
(0) 1473 729537
Mobile:
+44
(0) 7801 948219
Fax:
+44
(0) 870 7390077
Web:
www.choreology.com
Cohesions™
Business
transaction management software for application
coordination
Work:
Home:
← Prev in month
← Prev in thread