← Prev in month
← Prev in thread
Next in thread →
Next in month →
Issue 189: Eliminate JoinConditions always evaluating only after all source activities are complete
Title: Message
This issue has been added
to the wsbpel issue list with a status of "received". The status will be changed
to "open" if the TC accepts it as identifying a bug in the spec or decides it
should be accepted specially. Otherwise it will be closed without further
consideration (but will be marked as "Revisitable")
The issues list is posted as a Technical Committee document to the OASIS WSBPEL TC
pages on a regular basis. The current edition, as a TC document, is the most
recent version of the document entitled in the "Issues" folder of the WSBPEL
TC document list - the next posting as a TC document will include this
issue. The list editor's working copy, which will normally include an issue when
it is announced, is available at this constant
URL.
Issue 189: Eliminate JoinConditions
always evaluating only after all source activities are
completeStatus: received
Date added: 29 Jan
2005
Categories: State
management
Date submitted: 27 January 2005
Submitter: Prasad Yendluri
Document:
WS-BPEL Working Draft, December, 2004
Description: The BPEL
specification currently requires that a joinCondition on a target activity be
evaluated only after all sources activities for the links coming into it are
complete, whether or not the the joinCondition calls for it. In situations such
as an activity needs only one of its source activities to be complete (as in the
case of an implicit-join), it is unnecessary with serious performance
implications to require that all source activities must be complete prior to
evaluating the join condition.
Submitter's proposal: The specification must eliminate this built-in
inefficiency and facilitate evaluation of joinCondition each time an incoming
link has a status change, *as an option* on the joinCondition or as a
process/scope level enabler.
Links: (Note considerable discussion before formal raising of an
issue) Prasad
Yendluri, 27 Jan 2005 Danny
van der Rijn, 27 Jan 2005 Prasad
Yendluri, 27 Jan 2005 Dieter
Koenig1, 27 Jan 2005 Prasad
Yendluri, 27 Jan 2005 Danny
van der Rijn, 27 Jan 2005 Prasad
Yendluri, 27 Jan 2005 Tony
Fletcher, 27 Jan 2004 Danny
van der Rijn, 27 Jan 2005 Prasad
Yendluri, 27 Jan 2005 Announcement,
29 Jan 2005
Changes: 29 Jan 2005 - new
issue
Best
Regards,
Tony
Tony
Fletcher
Technical
Advisor
Choreology
Ltd.
68, Lombard Street, London EC3V 9L J
UK
Phone:
+44
(0) 1473 729537
Mobile:
+44
(0) 7801 948219
Fax:
+44
(0) 870 7390077
Web:
www.choreology.com
Cohesions™
Business
transaction management software for application
coordination
Work:
Home:
← Prev in month
← Prev in thread
Next in thread →
Next in month →