← Prev in month ← Prev in thread

[OASIS Issue Tracker] (UBL-113) ProcurementProjectLot in the QualificationApplicationResponse

From
OASIS Issues Tracker <>
Date
2017-04-21T19:50:42+00:00
ID
Thread
[OASIS Issue Tracker] (UBL-113) ProcurementProjectLot in the QualificationApplicationResponse
Enric Torregrosa created UBL-113:
------------------------------------

             Summary: ProcurementProjectLot in the QualificationApplicationResponse
                 Key: UBL-113
                 URL: https://issues.oasis-open.org/browse/UBL-113
             Project: OASIS Universal Business Language (UBL) TC
          Issue Type: Bug
          Components: Artefacts
            Reporter: Enric Torregrosa
            Assignee: Enric Torregrosa


The more I practice the new model the less comfortable i feel with the solution provided in the QualificationApplicationResponse. 

In the Response document, the ESPD business requirements specify that both (1) the lots into which the  PP is divided and (2) the lots to which the EO tenders need to be in the "self-contained" ESPD Response document.

How could we solve this? Doesn't a similar situation occur in UBL. ever?



--
This message was sent by Atlassian JIRA
(v6.2.2#6258)
← Prev in month ← Prev in thread