← Prev in month
← Prev in thread
Next in thread →
Next in month →
Minutes from the EDXL Work Plan Group - and call to participate
Dear EM-TC Members, As discussed in our 11/30 conference call and addressed to all in the minutes of that call, a work plan group was formed to discuss how we would approach the EDXL issue. That conference call took place on 12/2/04 and the minutes are below. Please feel free to join the next call, Thursday 12/09/04 at the normal dial in number (877-302-3764 Code: 5565345). Elysa Minutes of the 12/02/04 Conference Call As set up during the last EM-TC conference call (11/30) we had a conference call meeting of the EDXL Work Plan Group 12/2/04. The call included Art Botterell, Rex Brooks, Tom Merkle, Paul Embley and Elysa Jones. This purpose of the call was to address how the TC would address the EDXL work as well as other work identified on the 11/30 call. The following was decided: 1. The current efforts are defined to be: Vocabulary - Rex Brooks will head up an effort to look into the ways currently in use to designate different words that may have similar meanings. This is the taxonomy problem we have discussed relative to multiple agencies trying to harmonize on a given data dictionary. We have agreed to go a head with the EDXL effort with the taxonomy provided and get back to the EIC with any issues beyond our control, e.g., issues of policy. However, we will take what we have, study what other groups have done with this problem and develop or adopt a means to utilize the various dictionaries. Rex will be attending a meeting 12/9 where this issue will be discussed in a different forum and will provide feedback to the group. EDXL - The routing identified in the EIC handoff will be taken as an effort for spec development. Elysa will head this up (since Gary and Rob weren't on the call). Gary and Rob will contribute much since they have developed implementations already. Transport - It is understood that there is no clear defined/documented/spec'd transport layer for CAP. This is intentional and it remains our desire to keep CAP at the application layer separate from the mechanisms of the transport layer. It is important, however, to profile the three main transports used and establish some clear cut guidelines for implementors. The three transports we will profile are 1) SOAP as used by DMIS and MyStateUSA servers 2) RSS and 3) IP Broadcast. Art has agreed to begin work on this section and gather information for the group to review. 2. We decided that the first phase of this work would be done as a full TC. That is, there will not be a subcommittee designated for any part identified above. The existing subcommittees are doing useful work and should be left on track. These issues are germane to the entire TC and certainly of interest. We anticipate additional members joining to have a say in these standards and it seems best to keep all notes on the list open to all parties. 3. The next call of this working group will be 12/9 at 1:00 EST. 4. There was also some discussion about security and how it must be addressed. We chose not to address it now but agree that it can't be ignored. We will consider a recommendation down the road after doing a fair evaluation. Respectfully submitted, Elysa Jones Chair EM-TC
← Prev in month
← Prev in thread
Next in thread →
Next in month →